PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Erecting Derrcik -3 3rd Floor Facing North (800x600).jpg Erecting Derrick -3 (2nd and 3rd Floor) Facing South-East (800x600).jpg Excavation at Rahway Ave. Pic -1 (800x600).jpg Excavation at Rahway Ave. Pic -2 (800x600).jpg Installing underground sanitary piping at Room 105 (Servery) Facing West (800x600).jpg Underground conduit for the Tele-Data at Rahway Ave. (800x600).jpg Building rebar column for Elev. 5,6 (4th Floor) Facing North-West (800x600).jpg Raised the slip forms at Elev. 4-Stair -2 (4th Floor) Facing South West (800x600).jpg
Previous pageNext page Installing underground sanitary piping at Room 105 (Servery) Facing West (800x600)
Installing underground sanitary piping at Room 105 (Servery) Facing West (800x600)